1 / 4Cheney, WA 99004
Production-schedule siding on a new single-level home outside Cheney: board-and-batten gables over lap walls with a timber-frame entry and new black-framed windows set and flashed in the same sequence, delivered dried-in and paint-ready in ten working days.
Builder work is its own discipline: one spec sheet, one crew, zero improvisation. The shell went from housewrap to paint-ready in ten working days, with story-pole layout keeping every lap course honest across the elevations, joints landing on studs, and all penetrations flashed before cladding, which is exactly what a builder needs to keep a schedule intact.
Like every Domex project, this one ran on a written, line-item proposal, was installed by our own licensed crews in Washington and Idaho, and is backed by our 12-month workmanship warranty on top of the manufacturer warranties on every product we installed.