1 / 2Spokane, WA 99205
City-lot install in Spokane: a tight two-story infill sided in greige lap with primed trim, worked around neighboring fences and power drops without slowing the builder down.
Infill lots test logistics more than craft: material was staged in the alley and carried through, scaffold legs sat inside the property line, and the neighbor's fence was protected the whole run. The Hardie went up blind-nailed to the manufacturer's ESR listing with joints on studs and flashed penetrations, delivered primed and paint-ready so the builder's painter could follow immediately.
Like every Domex project, this one ran on a written, line-item proposal, was installed by our own licensed crews in Washington and Idaho, and is backed by our 12-month workmanship warranty on top of the manufacturer warranties on every product we installed.