Spokane & Coeur d’Alene’s Trusted Exterior Specialists

Custom Home Builder in Nine Mile Falls, Washington

Custom homes on steep lots above Lake Spokane in Nine Mile Falls, WA. Engineered foundations, walkouts, Spokane or Stevens County permits. Call today.

$1,000 Off

Your Complete Siding Replacement

Online Special

Get a Free Estimate

FREE same-day estimates on all exterior projects.

5.0/5 from 27+ reviews
Step 1 of 2

What can we help with?

Same-day callback · No spam · Your privacy is protected.

Google Reviews
5/5 Rating
Yelp Reviews
5/5 Rating
Facebook Reviews
5/5 Rating
Angi Reviews
4.9/5 Rating
Houzz Reviews
5/5 Rating
GuildQuality Reviews
4.9/5 Rating

The lots above Lake Spokane sell on the water view, and the view comes from the same thing that makes them hard to build on: ground that falls away steeply toward the lake and the river. Building in Nine Mile Falls is two projects stacked together: a foundation that holds a house on a hillside without sliding, settling, or leaking, and the house everyone sees. Most of the money gets decided in the first one.

Domex Construction builds custom homes and lake houses on this corridor either as design-build, where we develop the plan with you and bring in a drafter or architect plus the engineers a steep site needs, or from plans you already have. On the first visit we also ask a question plenty of builders skip here: which county is your parcel in? We're registered in Washington as DAVYDCI833NC, fully insured, with nine years in business and 32 years of combined crew experience.

Engineering a House Onto the Slope

Steep lots don't forgive a guess. On the steeper parcels overlooking the lake, expect the county to want engineering, and often a geotechnical look at the soil, before it issues a permit. We plan and budget for that from the start rather than hoping the site slips through on a prescriptive design.

What comes back from the engineers shapes the house. Downhill footings get deeper and wider. Footings step to follow bearing soil instead of sitting on loose material. Retaining walls hold back the uphill cut and get their own drainage. Where rock turns up close to the surface, the footing plan changes to suit it. And the walkout wall, which on these lots can be a full story of exposed foundation, becomes a structural piece of the design, not an afterthought poured to match the floor plan.

Access costs money too. Narrow roads, tight switchbacks, and a building pad far down the hill from the street mean concrete often arrives by pump, trusses may need a crane, and materials have to be staged on whatever flat ground exists. Erosion control goes in before the first cut, because bare soil on a slope above the water moves with the first hard rain,.

Spokane County or Stevens County? Check the Parcel First

Nine Mile Falls isn't a city, and it doesn't sit neatly inside one county. The community straddles the Spokane and Stevens county line, and the side your parcel falls on decides who you deal with for almost everything. On the Spokane County side, the building permit comes from Spokane County, and septic and well review runs through the Spokane Regional Health District. On the Stevens County side, Stevens County issues the permit, and on-site sewage goes through the Northeast Tri-County Health District. Each has its own process, fees, and review pace.

Shoreline rules add a second layer. Both counties apply Washington's Shoreline Management Act through their own shoreline programs, so a parcel close to the lake or the river can carry setbacks and vegetation requirements that move the house back from where the listing photos suggested. We pull the parcel record and the shoreline designation before design starts, so the plan gets drawn to the right rulebook the first time.

Walkout Glass Facing the Water

Most homes here stack the same way: garage and entry at the top of the lot, main living space looking out over the lake, and a walkout level underneath with its own wall of glass. That downhill face is the hardest-working wall on the house. It's the tallest elevation, it faces weather coming up the canyon, and it holds most of the windows. Wind-driven rain finds every opening that isn't flashed right, and a three-story wall over falling ground is hard to reach once the landscaping is in.

That's the envelope our crews know best. We came up replacing siding and windows, including view windows in Nine Mile Falls, so we detail sill pans, head flashings, and the weather barrier on a new water-facing wall the way we'd want them if we were the ones called back in twenty years. Covered decks at the main level help too, shading the walkout glass and keeping rain off the lower doors.

Featured Nearby Project

[PROJECT PLACEHOLDER: replace with a real completed Domex project near Nine Mile Falls: photos, plans/spec, neighborhood, year. Do not publish this page without one.]

How We Take a River-Corridor Lot From Survey to Move-In

  1. Parcel check and slope walk. County, health district, shoreline designation, pitch of the lot, and how trucks get down to the pad. Free.
  2. Geotechnical and structural engineering. Soil findings and a foundation design matched to the slope, before the floor plan is locked.
  3. Permits with the right county. Building permit from Spokane or Stevens County, septic through the matching health district, and shoreline review if the parcel needs it.
  4. Cut, retain, and pour. Erosion control first, then excavation, retaining walls, stepped footings, drainage, and the walkout foundation.
  5. Frame and close in the downhill face. Framing, roof, and a flashed, sealed water-facing wall, then systems, finishes, inspections, and a final walkthrough.

Questions People Ask About Building Above the Lake

How do I find out which county my lot is in?

The parcel number on your purchase paperwork ties to one county's assessor records. We confirm it at the first visit, since it changes the permit office and the health district.

Will I need a geotechnical report?

On steep parcels, often. The county makes that call based on the slope and soils. We tell you early whether to expect one so it's in the budget, not a surprise at plan review.

How close to Lake Spokane can I build?

It depends on the shoreline designation for your stretch of water and which county administers it. Setbacks can be significant, so we check before anyone draws a footprint.

Can a concrete truck even get down to my building site?

Sometimes not directly. A pump truck, a crane day, or a temporary access road each show up as a line in the proposal.

Could we build a smaller lake cabin now?

Yes. A cabin sized for weekends still needs the same engineered foundation and septic approval as a full-time house, so we'd design those to fit a future expansion if one's likely.

Licensed Along the River

Domex Construction is registered in Washington as WA DAVYDCI833NC, which you can look up through the Department of Labor & Industries contractor search, and carries full insurance. Ask about our workmanship warranty when we walk your lot. From Nine Mile Falls we also build in Suncrest, Tumtum, Ford, Seven Mile, and northwest Spokane.

Holding a lot above the water and wondering what it'll take to build on it? Call for a free consultation, and we'll start with the parcel record and a walk down the slope.


More from Domex in Nine Mile Falls: Siding Installation in Nine Mile Falls · Window Replacement in Nine Mile Falls · Custom Decks in Nine Mile Falls · Custom Home Builder: Spokane hub

27+ Google Reviews

Start Your Custom Home Building Project Today!

Get a free on-site estimate from Spokane and Coeur d'Alene's trusted exterior contractor.