Spokane & Coeur d’Alene’s Trusted Exterior Specialists

Custom Home Builder in Kellogg, Idaho

Custom ski cabins and second homes in Kellogg, Idaho, built under Panhandle Health District ICP soil rules. Design-build or your plans. Free consultation.

$1,000 Off

Your Complete Siding Replacement

Online Special

Get a Free Estimate

FREE same-day estimates on all exterior projects.

5.0/5 from 27+ reviews
Step 1 of 2

What can we help with?

Same-day callback · No spam · Your privacy is protected.

Google Reviews
5/5 Rating
Yelp Reviews
5/5 Rating
Facebook Reviews
5/5 Rating
Angi Reviews
4.9/5 Rating
Houzz Reviews
5/5 Rating
GuildQuality Reviews
4.9/5 Rating

Most people who call us about building in Kellogg already know where they want to be on a February Saturday: on the gondola, with a house nearby that holds their skis, dries their boots, and keeps itself warm for the weeks nobody is there. A ski cabin at the base of Silver Mountain is a different building than a house you live in every day. It also sits on some of the most carefully regulated dirt in Idaho, and that shapes the job before the first footing gets dug.

Domex Construction builds custom homes on two tracks: design-build, where we develop plans with you and bring in a drafter or engineer as the house requires, or build-to-plan, where you hand us drawings from your own designer (a stock cabin plan counts) and we build them. Idaho license RCE-66940, fully insured, nine years in business, 32 years of combined crew experience, and roots in siding, windows, and decks that show in how a new house sheds snow and water.

Digging Under the Institutional Controls Program

A century of mining and smelting left lead and other heavy metals in the soils of the Silver Valley. The Superfund cleanup dealt with that largely by covering contaminated ground with a barrier: clean soil, gravel, pavement, or a building. The Institutional Controls Program, run by Panhandle Health District, keeps that barrier intact as people keep building. Any project here that moves dirt runs through it, and a new house moves a lot of dirt.

What that means on a custom home:

  • A permit to disturb soil. Before excavation, the project needs ICP approval from Panhandle Health District, separate from the building permit. It covers the foundation dig, utility trenches, the driveway, and final grading.
  • Soil that leaves the lot goes to the right place. Excavated material that isn't staying on site gets hauled to an approved disposal site under ICP rules, not spread on a neighbor's yard or dumped wherever a truck finds room.
  • Clean material comes in. Fill, topsoil, and base rock brought onto the lot have to be clean, and the finished yard ends with a barrier over remaining native soil. Landscaping is part of compliance.
  • Dust and tracking get controlled. Wet-down, covered loads, and keeping mud off the street are part of how the dig is run.

The part owners don't expect is how ICP feeds back into design. Every cubic yard that comes out of a full basement has to be handled and hauled under the program's rules. A crawlspace or shallower foundation keeps more soil on site, balanced into the grading under a proper cap. Sometimes the basement earns it (a big gear room and a bunk level are real value in a ski house), but we price the dig and disposal at the design stage so you choose with real numbers.

A Ski House That Spends Weeks Alone

A second home near the gondola gets used hard for a weekend, then sits empty until the next one. The design plans for both.

Water lines stay inside the warm envelope. Supply runs go in interior walls, never in an exterior wall where a cold snap finds them while you're in Spokane. We plan a shutoff and drain points you can reach in ten seconds, plus a spot for a low-temperature alarm so a failed furnace doesn't become a ruined floor.

The entry is built for gear. A real boot room with a floor that takes wet traffic, ski racks, glove drying, and a garage bay deep enough for a truck. Skip it and you get snowmelt on the hardwood every weekend.

The roof decides where snow lands. Doors, the garage apron, and the walk to the car belong on gable ends or under protected overhangs, not under an eave that dumps a winter's snow at the door. Lots near the mountain are rarely big, so we also mark where plowed snow will be stored before the driveway is poured.

The skin has to take care of itself. An owner who visits twice a month can't catch a failed caulk joint early, so factory-finished fiber cement, flashed windows, and water-shedding trim matter more here. Our Kellogg siding page covers how those materials behave in the valley.

Some owners want a guest house or a lock-off suite. Whether a second unit or short-term rental is allowed on your parcel is a city zoning question, and we check it before anyone draws it.

Featured Nearby Project

[PROJECT PLACEHOLDER: replace with a real completed Domex project near Kellogg: photos, plans/spec, neighborhood, year. Do not publish this page without one.]

From Gondola-View Lot to Keys in Hand

  1. Lot walk and ICP check. We look at the parcel, the existing barrier, truck access, and where snow will go, and confirm soil-disturbance requirements with Panhandle Health District before design money gets spent.
  2. Design around the dig. Foundation type, garage placement, and grading get settled with soil volume in mind, on our plans or yours.
  3. Two permit tracks. The building permit goes through the City of Kellogg (or Shoshone County outside town), and the ICP permit goes through Panhandle Health District. We run both.
  4. Excavation by the rules. Spoils hauled to approved disposal, clean fill brought in, dust controlled, trenches backfilled correctly.
  5. Build, cap, and hand over. Framing through finish, the yard restored with a compliant barrier, and a walkthrough on shutting the house down between trips.

Silver Mountain Cabin Questions

Does the ICP apply to my lot?

If the parcel is inside the program's boundary, which covers the town, yes. Panhandle Health District confirms it by address, and we check on the first walk.

How much does ICP compliance add to the cost?

Mostly on how much soil leaves the site. A crawlspace on a lot that balances its grading costs far less to comply than a full basement on a tight lot. We break it out as its own line.

Can we build in winter to be ready for next ski season?

Excavation wants thawed ground, so spring digging with framing through summer is the usual path. You get a written schedule once plans and permits are settled.

Can the house pay for itself as a rental when we're not using it?

That's a zoning question for the City of Kellogg. If rental use is part of the plan, tell us early so layout, egress, and lock-off storage are designed for it.

Licensed Up and Down the Silver Valley

Domex Construction is registered in Idaho as RCE-66940, which you can verify through the Idaho Contractors Board, and we carry full insurance. Our crews also build in Wardner, Smelterville, Pinehurst, Osburn, and Wallace along the I-90 corridor.

Found a lot near the mountain, or already own one with a stack of cabin plans? Call us for a free consultation. We'll walk the ground and tell you what the dirt is going to ask for.


More from Domex in Kellogg: Siding Installation in Kellogg · Window Replacement in Kellogg · Custom Decks in Kellogg · Custom Home Builder: Spokane hub

27+ Google Reviews

Start Your Custom Home Building Project Today!

Get a free on-site estimate from Spokane and Coeur d'Alene's trusted exterior contractor.