Spokane & Coeur d’Alene’s Trusted Exterior Specialists

Custom Home Builder in Otis Orchards, Washington

Acreage homes, shops and second homes on family land in Otis Orchards. Septic, well and Spokane County permits coordinated. Free consultation.

$1,000 Off

Your Complete Siding Replacement

Online Special

Get a Free Estimate

FREE same-day estimates on all exterior projects.

5.0/5 from 27+ reviews
Step 1 of 2

What can we help with?

Same-day callback · No spam · Your privacy is protected.

Google Reviews
5/5 Rating
Yelp Reviews
5/5 Rating
Facebook Reviews
5/5 Rating
Angi Reviews
4.9/5 Rating
Houzz Reviews
5/5 Rating
GuildQuality Reviews
4.9/5 Rating

A lot of the land in Otis Orchards has been in the same family for decades. The old orchard tracts east of the Valley were split into parcels of an acre or several, and many of them now hold a parent's house with open ground behind it. So the first call here is often about a second house: a son or daughter building next to mom and dad, or parents downsizing while the kids take the main house. The other common call is an acreage home with a shop, on a parcel near the Idaho line with room for both.

Domex Construction builds either one. Design-build, where we develop the plans with you and bring in a drafter or architect and an engineer as the project needs them, or build-to-plan, where we price and build the drawings you bring. We're licensed in Washington as DAVYDCI833NC, fully insured, with nine years in business and 32 years of combined crew experience.

Septic Over the Aquifer Sets the Site Plan

Under Otis Orchards sits the Spokane Valley-Rathdrum Prairie Aquifer, the EPA-designated sole-source aquifer that supplies drinking water across the Valley and into North Idaho. The ground above it is mostly coarse sand and gravel laid down by ancient floods. That gravel drains fast, which sounds good for a drainfield until you consider that it means less soil filtering effluent on its way to the water table. That's why the density of on-site septic systems over the aquifer is regulated, and why the Spokane Regional Health District reviews every new system.

In practice, the septic system gets settled before the house is drawn. The health district's process starts with a soil evaluation on your parcel: test holes dug where the drainfield would go, logged for soil type and depth. From that, the system gets designed and sited, along with space held in reserve for a future replacement drainfield. The drainfield and reserve area can't be driven over, paved, or built on, so they claim a real piece of the lot and often decide where the house, shop, and driveway can go.

Water comes next. Some roads out here have a water district main; other parcels need a well, and a well has to keep its required distance from any drainfield, yours or your neighbor's. On a parcel with an existing house, we pull what records exist and locate its septic and well before anyone draws a line.

A Second House on the Family Parcel

Whether a second home can go on your parcel is a Spokane County zoning question that turns on the zone, the lot size, and what's already there. It might be allowed as an accessory dwelling, it might require dividing the parcel, or it might not be allowed at all. Septic density over the aquifer can be the deciding factor even when zoning would allow it, because a second house generally means more wastewater on the same ground. We sort that out with the county and the health district before you spend money on plans.

When the answer is yes, the design has to work for two households on one piece of land. That means a driveway laid out so neither family backs across the other's yard, separate power metering if you want it, and a site plan that keeps drainfields, well, and both houses where the rules allow. For parents moving into the second house, we usually push for single-level living: a no-step entry, a wider hallway, and a bathroom that will still work in twenty years.

Acreage Home and Shop, Planned as One Site

On a bigger parcel, the shop often matters almost as much as the house. We plan them together from the first site walk: where the shop door faces so a trailer can swing in, where the driveway loops so a truck never has to back out onto the road, and how both buildings sit relative to the septic, the well, and the view toward the hills. An afterthought shop tends to land on the drainfield reserve.

Building the driveway and shop pad early gives the job a solid staging area, and sometimes the shop can go up first. Both buildings run through Spokane County permitting, since Otis Orchards is unincorporated, and both need footings set deeper than local frost. If you want the shop to match the house outside, our siding crew sides both with the same profile and color.

Featured Nearby Project

[PROJECT PLACEHOLDER: replace with a real completed Domex project near Otis Orchards: photos, plans/spec, neighborhood, year. Do not publish this page without one.]

Otis Orchards Acreage Build, Start to Finish

  1. Parcel and records check. Zoning, existing septic and well records, road frontage, and power confirmed, and a straight answer on whether a second house is possible.
  2. Soil evaluation and septic design. Test holes dug and reviewed through the Spokane Regional Health District, with the drainfield and reserve area located first.
  3. Site plan and design. House, shop, driveway, well, and drainfield laid out together, then design-build drawings or your plan set adapted to fit.
  4. Spokane County permits. Building permits for the house and shop, septic permit through the health district, and well work coordinated where needed.
  5. Site work and build. Driveway, excavation, utilities, and foundations, then framing through finishes, with county inspections along the way.

Questions About Building in Otis Orchards

Can I build a second house on my parents' land?

Sometimes. It depends on the parcel's zoning, its size, and whether the septic rules over the aquifer allow another system. We check with Spokane County and the health district before any design work.

Why does septic come first on a new build here?

Because the drainfield's location, and its reserve area, limit where everything else can go. The aquifer's fast-draining gravels are the reason the health district reviews systems so carefully.

Do I need to drill a well?

It depends on the road. Some parcels can connect to a water district; others need a well. We find out during the records check.

Can we build the shop before the house?

Often, yes, and it can make a useful staging building. It still needs its own permit and a site plan that shows where the house will go.

Licensed in Washington, Next Door to Idaho

Domex Construction is licensed in Washington as DAVYDCI833NC, verifiable through the Department of Labor & Industries contractor lookup, and in Idaho as RCE-66940, and we're fully insured. Ask about our workmanship warranty at the consultation. From here our crews build in Newman Lake, Liberty Lake, Greenacres, and Spokane Valley, and across the state line in Post Falls.

Planning a second house on family land, or a home and shop on open acreage? Call us for a free consultation, and we'll walk the parcel with you.


More from Domex in Otis Orchards: Siding Installation in Otis Orchards · Window Replacement in Otis Orchards · Custom Decks in Otis Orchards · Custom Home Builder: Spokane hub

27+ Google Reviews

Start Your Custom Home Building Project Today!

Get a free on-site estimate from Spokane and Coeur d'Alene's trusted exterior contractor.